Project : The rehabilitation of 14 October secondary school – Malla’a
الخميس - 27 مايو 2021 - الساعة 01:24 ص بتوقيت اليمن ،،،
Project Name: The rehabilitation of 14 October secondary school – Malla’a
Client: Emirate Red Crescent
Period: 2015
Services performed:
• Check the electrical wiring.
• Replace the lighting bases and change/fix them.
• Plumbing works
• Wire and sewer line extensions works
• Detection of water leaks and fix them
• Repairing toilets and faucets
• Installation and replacement of damaged doors
• Installation of fans
• Internal and external paints works
• Walls repairing
• Repair and fixing of windows
• Repair and installation of floors and walls (ceramic and marble)
• Demolition of dilapidated parts which need maintenance and redesign