Project : The rehabilitation of 14 October secondary school – Malla’a

الخميس - 27 مايو 2021 - الساعة 01:24 ص بتوقيت اليمن ،،،

Project Name: The rehabilitation of 14 October secondary school – Malla’a

Client: Emirate Red Crescent

Period: 2015

Services performed:

•    Check the electrical wiring.
•    Replace the lighting bases and change/fix them.
•    Plumbing works
•    Wire and sewer line extensions works
•    Detection of water leaks and fix them
•    Repairing toilets and faucets
•    Installation and replacement of damaged doors
•    Installation of fans
•    Internal and external paints works
•    Walls repairing
•    Repair and fixing of windows
•    Repair and installation of floors and walls (ceramic and marble)
•    Demolition of dilapidated parts which need maintenance and redesign